Uploaded image for project: 'eZ Platform Enterprise Edition'
  1. eZ Platform Enterprise Edition
  2. EZEE-752

Overflow target schedule block changes are shifted by one

    XMLWordPrintable

Details

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: High High
    • None
    • None
    • Studio UI

    Description

      Overflow target schedule block changes are shifted by one.

      Steps:
      1. Create a new LP with at least 2 zones.
      2. Add two schedule blocks, one per zone.
      3. Set overflow (from hero to grid).
      4. Add 4 content items to 1st block (hero) with ca. 2 hour gaps. Confirm overflow for items 2-4.
      5. Check the timeline for 1st block. (move the timeline slider after the last change)
      [4 changes are visible]
      6. Check the timeline for 2nd block.
      Actual: 3 changes are visible and are shifted to the left by one.
      Expected: 3 changes are visible in the right positions.

      Remarks: Please see attached.

      Attachments

        1. EZS-752 1.png
          EZS-752 1.png
          381 kB
        2. EZS-752 2.png
          EZS-752 2.png
          554 kB

        Activity

          People

            Unassigned Unassigned
            michal.szoltysek@ibexa.co Michał Szołtysek
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: